As an Amazon Associate I earn from qualifying purchases.

lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog

$17.49

Added to wishlistRemoved from wishlist 0


Price: $17.49
(as of Mar 26,2022 18:38:02 UTC – Details)


Product Description

Lynxking dog collars and leashes
Lynxking dog collars and leashes

Lynxking check cord long dog lead is a great tool for exercising and training dogs, lightweight but sturdy and durable, it’s easy to coil and carry, this high-visibility rope lead has three length for different training purpose, feel soft on your hands, tangle-free to prevent knots that get hung up on the groves, check cord will float if submerged, it has enough length to allow them wandering and ensure your command to be obeyed, great for teach your dog recalls and other obedience, skills, use it as a backyard dog leash, for off leash dog training, and more!
Available Lengths: 9.5 mm (3/8″) in diameter by10ft, 15 ft, 30 ft, 50 ft three length for different training purpose. Great for small, medium and large dogs.
Details: Woven double layer soft handle+Durable braided rope leash + 360° Rotation clasp to resist twisting + Leather clips

check cord handle

check cord handle

tangle free snap hook check cord

tangle free snap hook check cord

soft rope

soft rope

leather clip

leather clip

Comfortable double layer woven handle

Comfortable woven double layer soft handle, has good grip and won’t burn your hand.

Tangle free snap hook

360 degree rotation zinc alloy hook tangle free design, strong and rust-proof.

bright colors

It’s smooth in texture, lightweight but strong enough to hold over 80lbs of water crazy dog

leather clips

Machine stitched leather clips, odorless and durable no plastic design to be both beautiful and functional.

Thickness
3/8″
3/8″
3/8″
1/2″
1/2″
1/2″
Length
15 foot
30 foot
50 foot
6 foot
6 foot
5 foot
Color
Orange
Black
Orange
Blue
Orange
Green
Style
Long training lead
Long training lead
Long training lead
Slip lead
Snap leash
Snap leash
Feature
Braided long rope dog lead 15 ft
Braided long rope lead 30 ft
Braided long rope leash 50 ft
Slip on dog leash for large dogs
Braided rope leash with handmade leather clips
Safety reflective rope leash with padded handle

long dog leash check cord lead
long dog leash check cord lead

Great for walking and training

Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming!

long training leash
long training leash

long leash for training

Perfect for outdoor hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming!great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.

Is Discontinued By Manufacturer ‏ : ‎ No
Package Dimensions ‏ : ‎ 11 x 6.2 x 2 inches; 12.8 Ounces
Date First Available ‏ : ‎ October 10, 2019
Manufacturer ‏ : ‎ Keenleader.,ltd.
ASIN ‏ : ‎ B07VJ8FYCD

NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won’t get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
SIZE: 3/8″ (9.5 mm) in diam ,Size of this one is 30foot,color orange, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose

lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog
Woman likes
Logo
Enable registration in settings - general
Shopping cart